insect2006 发表于 2012-5-7 16:27:04

画好原理图DRC检测报错,看不懂,求指教!!

The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(7.90, 0.80)


不知道啥意思,求指教!!

insect2006 发表于 2012-5-7 16:28:40

--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 2.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.50, 2.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 3.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 3.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 4.00)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.20, 3.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.00, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.20, 3.40)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 2.90)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 3.90)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.60, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.00, 3.40)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.00, 1.60)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.40, 4.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.10, 4.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 2.10)

金志峰 发表于 2012-5-17 10:00:28

我和你现象一样 你解决了吗?
页: [1]
查看完整版本: 画好原理图DRC检测报错,看不懂,求指教!!