PCB论坛网

 找回密码
 注册
查看: 969|回复: 0

Test Pin plant restricted by S/M opening

[复制链接]
发表于 2009-2-1 15:48:00 | 显示全部楼层 |阅读模式

Hi all,

We are facing a critical problem on E-T capability. In our E-T fixture design regulation, if isolated single electrical net with unilateral S/M opening less than 4mil, it will not be tested. The registration of S/M, DF and drilling resulted in such limitation. In other word, there are some nets without pass E-T escaped to customers. Dose you have the same issue? If not, how to solve this problem?  As I known, Viasystem faced the same problem as Multek encountered. 4mil S/M opening is the limit capability PCB industry?

Do you have any advice on capability improvement except improve registration precision of OL DF, S/M and Drilling. Or change different pitch test pin?

Please give me a hand, your great support will be appreciated.

You can send E-mail to me by: Simon.Chan@hk.multek.com

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

Archiver|小黑屋|手机版|PCB设计论坛|EDA论坛|PCB论坛网 ( 沪ICP备05006956号-1 )

GMT+8, 2025-5-17 22:56 , Processed in 0.129776 second(s), 19 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表