- 积分
- 671
- 兑换点
- 点
- 声望度
-
- 金钱
- 元
- 银行存款
- 元
- 贡献度
-
- 精华
|
if anyone can help explain below information. Does customer want the two seperate parts to be supplied holding together with adhesive, or just want each of them supplied with an ahdesive.
Anyone can help, tks.
=================================================
I am sending you attached all the information for manufacturing since this is for 2 new parts.
One of the pcbs is to be manufactured in FR4 and the other one is to be manufactured in Aluminium.
Both pcbs must be sent with an adhesive which should be supplied together with the pcbs, and the customer will place it manually after assembling the boards.
This has been agreed with Dave Hunton which has arranged for the adhesive to be cut to size and send it to GSPK so it can be sent together with the pcbs.
================================================= |
|