PCB论坛网

 找回密码
 注册
查看: 2690|回复: 2

画好原理图DRC检测报错,看不懂,求指教!!

[复制链接]
发表于 2012-5-7 16:27:04 | 显示全部楼层 |阅读模式
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(7.90, 0.80)


不知道啥意思,求指教!!
回复

使用道具 举报

 楼主| 发表于 2012-5-7 16:28:40 | 显示全部楼层
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 2.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.50, 2.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 3.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 3.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.70, 4.00)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.20, 3.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.00, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.20, 3.40)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 2.90)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.70, 3.90)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.60, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.00, 3.40)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.00, 1.60)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.40, 4.30)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.10, 4.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 2.10)
回复 支持 反对

使用道具 举报

发表于 2012-5-17 10:00:28 | 显示全部楼层
我和你现象一样 你解决了吗?
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

Archiver|小黑屋|手机版|PCB设计论坛|EDA论坛|PCB论坛网 ( 沪ICP备05006956号-1 )

GMT+8, 2024-5-5 15:32 , Processed in 0.128935 second(s), 19 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表